Front End Engineering Design & Detail Engineering

  • Mechanical data sheets of the main equipment, starting from the process specifications issued during the BEDM and incorporating the specific requirements of codes and standards to be applied to the project in question.
  • Preparation of tender packages for the main equipment.
  • Development of process and utility Piping and Instrument Diagrams released for detail engineering.
  • Development of detailed plot plans and hazardous areas.
  • Elaboration of the main piping, instrument, electrical and civil works layouts.
  • And all the studies to be performed before ordering the main equipment.
  • Purchasing support documents for equipment
  • Development of Piping and Instrument Diagrams released for construction.
  • Development of detailed piping drawings, including isometrics and stress calculations.
  • Development of detailed drawings related to instrumentation, electrical facilities and civil works.
  • Management of vendor drawings.
  • Cost and schedule control.
  • Start-up procedures.

Contact us
.

Follow:

VD TECHNOLOGY CENTER Office No 602 , Sixth Floor , Mirage Arcade CHS ltd , Nehru Road , Opposite Ganesh Mandir , Dombivli East-421 201 GSTIN:27ASHPD6757E1ZO

VD Technology Center

Hello, Welcome to VD Technology Center

I am your virtual Oil field expert 😎

I am here to guide through various services of VD Technology Center

Let's verify your phone number first.